The words and expressions defined in CITC statutes shall have the same meaning when used in these rules. The following words and expressions shall have the meaning assigned to them below, unless the context requires otherwise:
New Developments:meansthe real estates to be developed by land and building developers, including land planning and preparation and buildings construction for residential, commercial, industrial, governmental or any other purpose.
Large Scale New Developments: means a New Developments satisfying any of the followings:
• A total area of more than (500,000) m².
• A built-up area of more than (100,000) m².
• One or more buildings with total of more than (40) planned stories above ground.
• Public buildings and facilities such as airports, universities, hospitals, railway stations and tracks, economic or entertainment cities, stadiums, etc.
Public lands: real property in which a proportion of its total area; such as streets, pavements, parks, squares, parking, public areas and others, is transferred to the relevant government authorities in terms of the ownership, management.
Private lands: real property which is entirely owned by the New Development owner after the completion of construction works. It is often an enclosed area, the owner of such property is responsible for streets planning, operation and maintenance, and the provision of other facilities and services.
Passive Network Components: include all the non-electric physical elements, such as buildings, sites, ducts, towers and masts, manholes, hand-holes, and cables, among others, that may serve for the provision of Outside Plant and In-building telecommunications networks.
Outside Plant (OSP): Any ICT network implemented with the aim of connecting it, or using it to connect, with the public telecommunications networks. OSP includes passive ICT networks components and any associated hardware located between a central distribution point at the border of the New Development and Access Points.
In-building Physical Infrastructure (IPI): means passive ICT networks components in a building connecting the Access Point with the Network Termination Points in the building units (also known as Inside Plant), including Network Termination Points, distribution frames, risers, telecommunications rooms and spaces, and lead-in ducts.
Access Point: means a physical point located outside the building accessible by public telecommunications networks, hosting the Optical Distribution Box (ODB), through which a connection between the Outside Plant and the In-building Physical Infrastructure is made. It is the demarcation point between Outside Plant and In-building Physical Infrastructure.
Network Termination Point (NT): is the point at which the In-building Physical Infrastructure (IPI) of a building unit terminates. A building unit may have multiple NTs.
High-speed-ready: means that the Outside Plant (OSP) and the In-building Physical Infrastructure (IPI), hosting all necessary passive network elements, enable data delivery at a minimum speed of 100 Mbps.
Agreement: means an agreement between concerned parties to construct, implement, own, or share Outside Plant (OSP) or Inbuilding Physical Infrastructure (IPI) in New Developments.
Developer: a person developing real estate through any of the followings:
• Preparing New Development sites for residential, commercial, industrial, governmental, or any other special purpose or public use (Land Developer).
• Construction of buildings (Building Developer).
Often, the owner of the real estate is also the
Developer, he is responsible for observing
Saudi building codes for construction and land
development works.